Software Engineering Online Test 3, Software Engineering Quiz 3
Finish Quiz
0 of 30 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
Information
Software Engineering Online Test 3, Software Engineering Quiz 3, Free Software Engineering Quiz, Online Software Engineering, online Test Quiz 3. Software Engineering Online Test 3 Question and Answers 2019. Software Engineering online Test Quiz 3. Software Engineering Test 3 Free Mock Test 2019. Software Engineering Online Test-3 Question and Answers in PDF. The Software Engineering online mock test paper is free for all students. Software Engineering Online Test is very useful for exam preparation and getting for Rank. Software Engineering Online Test-3 Question and Answers in English. Software Engineering Online Test for topic via String Handling Mode. Here we are providing Software Engineering Online Test in English Now Test your self for “Software Engineering Online Test in English” Exam by using below quiz…
This paper has 30 questions.
Time allowed is 30 minutes.
The Software Engineering Online Test is Very helpful for all students. Now Scroll down below n click on “Start Quiz” or “Start Test” and Test yourself.
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 30 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
Pos. | Name | Entered on | Points | Result |
---|---|---|---|---|
Table is loading | ||||
No data available | ||||
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- Answered
- Review
-
Question 1 of 30
1. Question
What are the steps of an effective measurement process?
Correct
The steps of an effective measurement process formulation, collection, analysis, interpretation and feedback.
Incorrect
The steps of an effective measurement process formulation, collection, analysis, interpretation and feedback.
-
Question 2 of 30
2. Question
What do I need to know in order to develop an effective use – case ?
Correct
To develop an effective use case, the main component is actors. The actors are people or computer systems.
Incorrect
To develop an effective use case, the main component is actors. The actors are people or computer systems.
-
Question 3 of 30
3. Question
Why is it difficult to gain a clear understanding of what the customer wants?
Correct
It is difficult to gain a clear understanding of what the customer wants because:
Problems of scope: Users fail to define the boundary of the system
Problems of understanding: Users are not completely sure of what is needed.
Problems of volatility: The requirements change over the time.Incorrect
It is difficult to gain a clear understanding of what the customer wants because:
Problems of scope: Users fail to define the boundary of the system
Problems of understanding: Users are not completely sure of what is needed.
Problems of volatility: The requirements change over the time. -
Question 4 of 30
4. Question
What architectures are defined and developed as part of BPE?
Correct
The goal of Business Process Engineering(BPE) is to define architectures. Three different architectures are analyzed and design in the context of business objectives and goal:
Data architecture
Application architecture
Technology infrastructureIncorrect
The goal of Business Process Engineering(BPE) is to define architectures. Three different architectures are analyzed and design in the context of business objectives and goal:
Data architecture
Application architecture
Technology infrastructure -
Question 5 of 30
5. Question
What key traits must exist among the people on an effective software team?
Correct
A number of key traits must exist among the people on an effective software team:
Competence
Common focus
Collaboration
Decision-making ability
Fuzzy problem-solving ability
Mutual trust and respect
Self organizationIncorrect
A number of key traits must exist among the people on an effective software team:
Competence
Common focus
Collaboration
Decision-making ability
Fuzzy problem-solving ability
Mutual trust and respect
Self organization -
Question 6 of 30
6. Question
What roles are played by people in the Web Engineering team?
Correct
The people in other traditional disciplines such as software engineering, to recognize Web engineering as a new field or team.
Incorrect
The people in other traditional disciplines such as software engineering, to recognize Web engineering as a new field or team.
-
Question 7 of 30
7. Question
What types of analysis activity occur during modeling of a web application?
Correct
Content analysis occur during modelling of web based applications.
content analysis or online textual analysis refers to a collection of research techniques used to describe and make inferences about online material through systematic coding and interpretation.Incorrect
Content analysis occur during modelling of web based applications.
content analysis or online textual analysis refers to a collection of research techniques used to describe and make inferences about online material through systematic coding and interpretation. -
Question 8 of 30
8. Question
What are the major quality attributes for web application?
Correct
Some major Quality attributes in web applications:
Conceptual integrity, Maintainability, Reusability, Availability, Interoperability, Manageability, Performance, Reliability, Scalability,Security, Supportability, Testability, Usability.
Incorrect
Some major Quality attributes in web applications:
Conceptual integrity, Maintainability, Reusability, Availability, Interoperability, Manageability, Performance, Reliability, Scalability,Security, Supportability, Testability, Usability.
-
Question 9 of 30
9. Question
Which types of design pattern are used for web application?
Correct
Hypermedia pattern is used for web applications. The use of design pattern for web applications can increase the quality of their design and decrease the time and cost of design and implementation.
Incorrect
Hypermedia pattern is used for web applications. The use of design pattern for web applications can increase the quality of their design and decrease the time and cost of design and implementation.
-
Question 10 of 30
10. Question
Which types of testing is designed to test the run time performance of software within the contest of an integrated system?
Correct
Types of System Testing:
Recovery testing: how well and quickly does the system recover from faults
Security testing: verify that protection mechanisms built into the system will protect from unauthorized access i.e hackers, disgruntled employees, fraudsters).
Stress testing: place abnormal load on the system
Performance testing: investigate the run-time performance within the context of an integrated systemIncorrect
Types of System Testing:
Recovery testing: how well and quickly does the system recover from faults
Security testing: verify that protection mechanisms built into the system will protect from unauthorized access i.e hackers, disgruntled employees, fraudsters).
Stress testing: place abnormal load on the system
Performance testing: investigate the run-time performance within the context of an integrated system -
Question 11 of 30
11. Question
Beta test is conducted at _______________
Correct
Beta Testing is done by end users therefore it is also known as field testing.
Incorrect
Beta Testing is done by end users therefore it is also known as field testing.
-
Question 12 of 30
12. Question
What interaction mechanisms are available to web application designers?
Correct
Following are the interaction mechanism are available to application designers. These are used to implement navigation options:
– Navigation menus
-Graphic images
– Graphic iconsIncorrect
Following are the interaction mechanism are available to application designers. These are used to implement navigation options:
– Navigation menus
-Graphic images
– Graphic icons -
Question 13 of 30
13. Question
Line of Code (LOC) is the key measure of which of the following metrics?
Correct
Lines of Code (LOC) is also known as Source Lines of Code (SLOC). It is software metric used to measure the size of a computer program by counting the number of lines in the text of the program’s source code.
Incorrect
Lines of Code (LOC) is also known as Source Lines of Code (SLOC). It is software metric used to measure the size of a computer program by counting the number of lines in the text of the program’s source code.
-
Question 14 of 30
14. Question
Software quality metrics like productivity metrics, focus on the …
Correct
Software quality metrics are a subset of software metrics that focus on the quality aspects of the product, process, and project.
Incorrect
Software quality metrics are a subset of software metrics that focus on the quality aspects of the product, process, and project.
-
Question 15 of 30
15. Question
“It is a test model. It can serve as ‘the first system’. Users get a feel for the actual system”. ‘It refers to…
Correct
The prototype model can serve as “the first system” Both the customer and developers like the prototyping paradigm. Users get a feel for the actual system, and developers get to build something immediately.
Incorrect
The prototype model can serve as “the first system” Both the customer and developers like the prototyping paradigm. Users get a feel for the actual system, and developers get to build something immediately.
-
Question 16 of 30
16. Question
The interface design describes ____________________
Correct
The interface design describes how the software communicates with system that interoperate with it, and with humans who use it. An interface implies a flow of information and a specific type of behavior.
Incorrect
The interface design describes how the software communicates with system that interoperate with it, and with humans who use it. An interface implies a flow of information and a specific type of behavior.
-
Question 17 of 30
17. Question
Function Oriented metrics were first proposed by
Correct
Function oriented metrics were first proposed by Albrecht. Albrecht suggested a productivity measurement approach called the function point method.
Incorrect
Function oriented metrics were first proposed by Albrecht. Albrecht suggested a productivity measurement approach called the function point method.
-
Question 18 of 30
18. Question
A quantitative measures of the degree to which a system, component , or process possess a given attributes.
Correct
Quality measure, metric and indicator are used to successfully measure quality of any software application.
– Quality measure: A measure is to ascertain by comparing to a standard.
– Quality metric: A metric is a quantitative measure of the degree to which a system, component or processes a given attribute.
-Quality indicator: It is a device or variable that is set to a prescribed state, based on the results of a process or the occurrence of a specified condition.Incorrect
Quality measure, metric and indicator are used to successfully measure quality of any software application.
– Quality measure: A measure is to ascertain by comparing to a standard.
– Quality metric: A metric is a quantitative measure of the degree to which a system, component or processes a given attribute.
-Quality indicator: It is a device or variable that is set to a prescribed state, based on the results of a process or the occurrence of a specified condition. -
Question 19 of 30
19. Question
A metric or combination of metrices that provides insight into software process, a software project or the product itself.
Correct
Metric – statistic that relates individual measures to one another.
Measure – provides a quantitative indication of the extent, amount, capacity, or size of some attribute of a product or process.
Indicator- metric or combination of metrics that provide insight into the software process, software project, or the product itself to make things better.Incorrect
Metric – statistic that relates individual measures to one another.
Measure – provides a quantitative indication of the extent, amount, capacity, or size of some attribute of a product or process.
Indicator- metric or combination of metrics that provide insight into the software process, software project, or the product itself to make things better. -
Question 20 of 30
20. Question
Project indicators enable a software project manager to ___________________
Correct
Process Indicators:
-Metrics should be collected so that process and product indicators can be ascertained.
-Process indicators enable software project managers to: assess project status, track potential risks, detect problem area early, adjust workflow or tasks, and evaluate team ability to control product quality.Incorrect
Process Indicators:
-Metrics should be collected so that process and product indicators can be ascertained.
-Process indicators enable software project managers to: assess project status, track potential risks, detect problem area early, adjust workflow or tasks, and evaluate team ability to control product quality. -
Question 21 of 30
21. Question
A software process model is chosen based on the _________________
Correct
software process model is used to solve actual problems in an industry setting, a software engineer or a team of engineers must incorporate a development strategy that encompasses the process, methods, and tools layers and the generic phases.
A process model for software engineering is chosen based on the nature of the project and application, the methods and tools to be used, and the controls and deliverable that are required.Incorrect
software process model is used to solve actual problems in an industry setting, a software engineer or a team of engineers must incorporate a development strategy that encompasses the process, methods, and tools layers and the generic phases.
A process model for software engineering is chosen based on the nature of the project and application, the methods and tools to be used, and the controls and deliverable that are required. -
Question 22 of 30
22. Question
Which of the following is the disadvantage of Linear sequential model ?
Correct
-Real projects rarely follow the linear sequential model. Although the linear model can accommodate iteration, it does so indirectly. As a result, changes can cause confusion as the project team proceeds.
-Process development is a time consuming and expensive activity. Thus, the software development team utilizes the existing processes for different projects.Incorrect
-Real projects rarely follow the linear sequential model. Although the linear model can accommodate iteration, it does so indirectly. As a result, changes can cause confusion as the project team proceeds.
-Process development is a time consuming and expensive activity. Thus, the software development team utilizes the existing processes for different projects. -
Question 23 of 30
23. Question
Which of the following is a phase of RAD model?
Correct
Phases of RAD model:
– Business Modeling
– Data modelling
– Process modelling
– Application generation
– Testing and turnoverIncorrect
Phases of RAD model:
– Business Modeling
– Data modelling
– Process modelling
– Application generation
– Testing and turnover -
Question 24 of 30
24. Question
RAD model is not appropriate when ________
Correct
Problem with RAD model is: it is not appropriate when technical risks are high.
Incorrect
Problem with RAD model is: it is not appropriate when technical risks are high.
-
Question 25 of 30
25. Question
Which of the following is a task region of the spiral model?
Correct
A spiral model that contains six task regions:
-Customer communication: tasks required to establish effective communication between developer and customer.
-Planning:tasks required to define resources, timelines, and other project related information.
-Risk analysis: tasks required to assess both technical and management
risks.
-Engineering: tasks required to build one or more representations of the application.
-Construction and release: tasks required to construct, test, install, and provide user support i.e documentation and training.
-Customer evaluation: tasks required to obtain customer feedback based
on evaluation of the software representations created during the engineering stage and implemented during the installation stage.Incorrect
A spiral model that contains six task regions:
-Customer communication: tasks required to establish effective communication between developer and customer.
-Planning:tasks required to define resources, timelines, and other project related information.
-Risk analysis: tasks required to assess both technical and management
risks.
-Engineering: tasks required to build one or more representations of the application.
-Construction and release: tasks required to construct, test, install, and provide user support i.e documentation and training.
-Customer evaluation: tasks required to obtain customer feedback based
on evaluation of the software representations created during the engineering stage and implemented during the installation stage. -
Question 26 of 30
26. Question
In risk analysis spiral model, which of the following risk include ______________
Correct
Risk Analysis includes identifying, estimating, and monitoring technical feasibility and management risks, such as schedule slippage and cost overrun.
Incorrect
Risk Analysis includes identifying, estimating, and monitoring technical feasibility and management risks, such as schedule slippage and cost overrun.
-
Question 27 of 30
27. Question
Which of the following is a purpose of Project metrics?
Correct
-To minimize the development schedule by making the adjustments necessary to avoid delays and mitigate potential problems.
-To assess product quality on an ongoing basis and when necessary, -Modify the technical approach to improve quality.Incorrect
-To minimize the development schedule by making the adjustments necessary to avoid delays and mitigate potential problems.
-To assess product quality on an ongoing basis and when necessary, -Modify the technical approach to improve quality. -
Question 28 of 30
28. Question
Software metrics domain can be divided into process, project and product metrics. Product metrics are …. to an individual are often combined to develop project metrics.
Correct
Product Metrics are Private to an individual and are often combined to develop Project Metrics that are Public to Software team.
Incorrect
Product Metrics are Private to an individual and are often combined to develop Project Metrics that are Public to Software team.
-
Question 29 of 30
29. Question
Which of the following is a software metrics?
Correct
Software metrics:
– Size-Oriented
– Function-oriented
– Extended function pointIncorrect
Software metrics:
– Size-Oriented
– Function-oriented
– Extended function point -
Question 30 of 30
30. Question
Measurement can be categorized into two ways, Direct measures and indirect measures. Size-Oriented matrics falls under which category ?
Correct
Measurements in the physical world can be categorized in two ways:
1) Direct measures
2) Indirect measures.
-Direct measures of the software engineering process include cost and effort applied. Direct measures of the product include lines of code produced, execution speed, memory size, and
defects reported over some set period of time.
– Size-oriented software metrics are derived by normalizing quality and/or productivity measures by considering the size of the software that has been produced.Incorrect
Measurements in the physical world can be categorized in two ways:
1) Direct measures
2) Indirect measures.
-Direct measures of the software engineering process include cost and effort applied. Direct measures of the product include lines of code produced, execution speed, memory size, and
defects reported over some set period of time.
– Size-oriented software metrics are derived by normalizing quality and/or productivity measures by considering the size of the software that has been produced.